Address: Shanghai Economic and Technological Development Zone Industrial Park Zeller

Tel:021-57715917

Fax:021-57715917

Hotline:400-003-9995

点击这里给我发消息 点击这里给我发消息

Your present position:Home > About us > Factory Tour

The most advanced flow production line in Europe

 

The introduction of European most advanced gas wall-mounted boiler production line. The line length is 70m, each line configurates eight professional testing engineers, 3 process engineers, 2 routing inspectors and 40 workers, and line configuration with five integrated testing station, an air tightness tester, a 6 Almighty electrical performance tester, a water tightness tester, which five RS2000 machine performance testing and evaluation systems used in all domestic and international top accessories, including Japanese SIKA, SIEMENS, HONEYWELL, etc., made for 11 months by a number of technical experts according to gas heating water heater  national standard GB25034, with advanced and comprehensive testing capabilities, in addition to an industry's first water-tightness tester, refering to tightness tester features, combined with the industry's common disadvantages of high pressure water leak, the newly developed water tightness test procedures, the stove pipe effectively prevent water hammer pressure tested and the deformation.Due to the sound equipment of each line, under normal operating conditions, the daily capacity of each effective production line reached 350 units, the annual output can up to 500,000 units.

     

 Overall comprehensive performance testing and evaluation

 Precision Salt Spray Test System

 Durability Test System

The first-class testing center in the world

Our company has the most advanced testing and evaluation center of boilers, and configured a senior engineer, 10 testing engineers, 1 gas analyst, including research and development laboratories, product testing room, materials inspection room, parts durable laboratory, the whole machine durability laboratory, moisture and gas analysis chamber supply chamber.

Finished product inspection room is mainly responsible for factory inspection, including overall performance testing, electrical performance testing, leak detection, smoke emission testing and visual inspection, meanwhile,the RS3000 machine performance testing and evaluation system which responsible for overall performance testing is on the basis of development of full-performance test features, is one of the most advanced domestic testing equipment of boilers.

Material inspection chamber is mainly responsible for inspection of parts into the plant, including full inspection of all kinds of electric control parts, and sampling a variety of imported electric control parts, etc. Now we have advanced electronic control parameters of the test system, the safety valve testing system, air pressure switch test system, water flow sensor testing system, testing temperature systems, advanced set of expansion tank, a burner, a proportional valve, a heat exchanger detection combined with 4 features in a test system, etc.

Parts endurance lab is mainly responsible for fatigue testing of key components, including temperature control system durability testing, durability testing water flow sensor system, air pressure switch endurance test systems, test systems, and salt spray and humidity test chamber, where temperature and humidity test system can simulate temperature -40 ℃ ~ +150 ℃, humidity 0 to 100% of a variety of operating environments, equivalent to simulate a variety of stove actual operating environment for testing, targeted for different markets to develop high-quality product, and the test system can also be low temperature test, salt spray test laboratory components can be a variety of metal parts and materials analysis confirmed the salt spray test, effectively ensuring the sameness of each batch of parts.

Machine endurance lab is mainly responsible for fatigue tests before product new listing, including 10 stations with intelligent automatic monitoring system can monitor the status of the different models in the testing process, and the pooled analysis, the formation of specialized databases, reference for R & D engineers to ensure that the function before the new listing perfect and durable recycled water used for direct access to the office, in the winter, while improving staff the office environment and achieve great experience heating effect, which is the industry's first multi-functional office building. Gas analysis chamber is primarily responsible for the analysis of each laboratory and sent to the assembly shop air supply to provide accurate testing and test data to ensure that accuracy of gas source during development,production and testing process, and that the qualified rate of finished product.

Water and gas supply chamber is mainly responsible for gas configuration, air supply and cooling water provided for laboratories and general assembly workshop, of which automatic continuous gas distribution system can simultaneously distribute two or more kinds of gas, gas analysed by gas chromatography analyzer, the preparation of the gas Wobbe accuracy can be controlled within 0.5%, which provides a layer of effective and reliable premise guarantee for testing and production.


Service:点击这里给我发消息

Service:点击这里给我发消息

Service:点击这里给我发消息


Hotline

400-003-9995


在线客服